The SA Data Centre Register

Announced and approved hyperscale data centre projects in South Africa, structured and sourced per row, with the exception count published alongside the data. Projects appear here; consultancies and practitioners never do.

Sociable Systems · Public register

The SA Data Centre Register

Announced and approved hyperscale data centre projects in South Africa: structured, sourced per row, and maintained in public. The register no public process keeps.

Every row links its source. Where a figure could not be verified it says so, where it was corrected it says so, and where the public record holds nothing the cell says unknown: the gaps are part of the finding. Projects appear here; consultancies and practitioners never do.

8projects on the register
6rows verified
2rows corrected
6approval routes not on any public record
6loads stated by operator or press, not by application

The register

Project Municipality Load Basis Route Status Water/elec figures Check Source
King Air IndustriaEquinix Cape Town unverified unknown Land-use (SPLUMA) Approved 14 Jul 2026one member dissenting Deferred to SDP Verified IOL
Erf 358 rectification401 Old Pretoria Rd, Midrand Johannesburg n/a unknown NEMA s24G Rectificationgenerator capacity Unknown Verified DM
Teraco CT1Rondebosch Cape Town 5 MW3 MW + 2 MW expansion Operator Unknown Under constructionearly 2027 Not found Verified EN
Teraco CT2Brackenfell Cape Town 50 MW Operator Unknown Operational Not found Verified TechAfrica
Vantage JHB IWaterfall City Johannesburg 120 MW Operator Unknown Operational Not found Verified Vantage
Vantage JHB II Johannesburg 20 MWfirst building Operator Unknown Announced Not found Verified BW
Cosmas Data City SamrandKosmosdal, 40 ha Tshwane 200 MW450 MVA own switching station Press Unknown Announced Not found Corrected DCD
Cosmas Data City Cape Townsite undisclosed, 100 ha Cape Town 360 MW Press Unknown Announced Not found Corrected DCD

Corrections logged this build: the 360 MW figure circulating for “Kosmosdal” belongs to the Cape Town campus; the Samrand site is 200 MW. Both are now stated as their sources have it. Corrections live at the Verification Ledger, not folded in silently.

The cumulative view no process produces

Stated loads summed per municipality. Marketing and operator figures are kept in view deliberately: this is what each system is being asked to absorb, on the only basis anyone has stated.

Cape Town415 MW · 4 projects
Johannesburg140 MW · 3 projects
Tshwane200 MW · 1 project

Exception report

  • 0 rows with load taken from a municipal application record
  • 6 of 8 rows: route through an approval process not on any public record we could find
  • 1 row with figures deferred to a post-decision stage
  • 2 rows corrected during this build

For context, reporting on this buildout puts the Cape Town pipeline at 34 per cent of the city’s current electricity supply. No register, no tribunal and no process aggregates the column above: this page exists because the arithmetic had no other home.

How this register behaves

  • Sources are per-row and linked. A row without a source does not enter.
  • Marketing MW and contracted MVA never mix. The cumulative view sums stated MW only. Contracted MVA, where a source gives one, is carried as a note against its row and never enters an aggregate; the one application-basis figure in the file (King Air) is pending re-verification and is not summed either.
  • Unknown is a value. Route, participation and figures are recorded as unknown rather than guessed: the count of unknowns is itself the finding.
  • Projects, never practitioners. No consultancy, EAP, planner or individual appears here, in any column.
  • The exception count is published with the data. A register that shows its own QA is the point of the exercise.

How to read this

A register, not an accusation. Every operator here may be following the standard process correctly; that is exactly the finding: the standard process does not produce this table, so nobody holds it.

Figures are as stated by their sources, on the date of the source, and the register updates as sources change. Context: a SAHRC inquiry opened on this buildout in August 2026.